Close Menu
  • Home
  • COMMUNITY NEWS
  • LOCAL NEWS & EVENTS
  • SCHOOL NEWS
  • MILITARY NEWS
  • CRIME / PUBLIC SAFETY
  • THINGS TO DO
  • HEALTH & WELLNESS
  • HOME & GARDEN
  • NORTHWEST FLORIDA NEWS
  • FLORIDA NEWS
  • Contact
Facebook
Facebook X (Twitter) YouTube
Niceville.com
Niceville.com
Home»MILITARY NEWS»New modular fire station for Tyndall is sign of progress
MILITARY NEWS

New modular fire station for Tyndall is sign of progress

Niceville.comApril 13, 20223 Mins Read
Tyndall Air Force Base, Florida, new modular fire station
U.S. Air Force Airman 1st Class Kadin Edwards, 325th Civil Engineer Squadron fire truck operator, directs a fire truck into a bay of a new modular facility at Tyndall Air Force Base, Florida, April 11, 2022. The facility is fully equipped to continue mission capabilities with a gym, three bunkhouses, three fire truck bays, an administrative office, and an emergency response facility. (U.S. Air Force photo by Airman 1st Class Anabel Del Valle)

TYNDALL AIR FORCE BASE, Fla. — As Tyndall Air Force Base’s renovation continues, a new modular fire station is coming in hot, providing a new workspace for 325th Civil Engineer Squadron Fire Station One personnel.

Advertisement
Eglin Federal Credit Union Mastercard promotional banner featuring a smiling couple in front of a decorated Christmas tree, advertising rates as low as 7.9% APR.

Niceville.com Community Partner

While Fire Station One was damaged during Hurricane Michael in 2018, the devastation provided Team Tyndall with the unique opportunity to design a new fire department.

“Between the damage sustained from Hurricane Michael and the new Air Force requirement upgrades needed, a new facility was financially a better option compared to repair,” said Mark Blake, Air Force Civil Engineer Center military construction project manager.

Since firefighters must always remain operational and mission-ready, a modular facility was outlined to support crash and rescue missions during the new station’s production.

“The [transitory]Fire Station One campus is the single largest footprint for a temporary facility,” explained Scott Dubuque, 325th Contracting Squadron services flight chief.

“This area cost just under $10 million of contracted efforts and is planned to house personnel for around five years.”

The modular station is fully equipped to continue mission capabilities with no discrepancies. It provides personnel with a gym, three bunk houses, three fire truck bays, an admin office and an emergency response facility.

“Having a new location, even if it’s temporary, will boost morale and provide a clean and sanitary work environment,” said Gregory Young, 325th CES fire inspector.

Advertisement
Trucordia insurance banner ad with contact information in Niceville

Niceville.com Community Partner

In addition to providing a better-equipped station for the firefighters, the modular facility marks progress towards building the “Installation of the Future.”

The decision to construct a new station has motivated Tyndall to install innovative technologies. Some of the technological advances planned include a wholly updated fire alarm reporting system to enhance emergency response capabilities.

Another advancement is the implementation of new training simulators expected to reduce wear and tear on equipment, maximizing use and saving the Air Force resources.

As Team Tyndall and the local community work to restore Panama City and surrounding areas after the storm, Tyndall’s progress acts as a model for resiliency, turning devastation into innovation.

“The fire department’s relocation is a sign of progress,” explained Young.

“As demolition across the installation comes to an end, and new construction begins, it allows personnel at Tyndall, especially those that have been working behind the scene, to start witnessing the ‘[Installation] of the Future’ finally taking shape.”

By Airman 1st Class Anabel Del Valle, 325th Fighter Wing Public Affairs

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleFlorida man sentenced to 51 months for nationwide tax fraud scheme
Next Article West Cervantes Street paving to take four weeks

Related Posts

The historic SS United States ocean liner, showing extensive rust along its black-and-white hull, docked ahead of its scheduled November 12, 2026, deployment as an artificial reef off Destin-Fort Walton Beach, Florida.

SS United States reef deployment set for Nov. 12 off Destin

October 29, 2026
Eglin Federal Credit Union employees Amanda Lewis-Hendrickson, Dawn Oravetz, Jamie Cervantes and Alicia Kennedy gather for a photo celebrating Cervantes' Five-Star Performer Award for the third quarter of 2026.

Eglin FCU honors Jamie Cervantes with Five-Star Performer Award

October 29, 2026
Building The Hub fundraising event invitation for The Hub Comprehensive Autism Center, scheduled for October 24, 2026, at The Barn at Water Oaks Farm in Laurel Hill, Florida.

Saturday fundraiser supports new autism center in Okaloosa

October 21, 2026
Advertisement
Eglin Federal Credit Union Mastercard promotional banner featuring a smiling couple in front of a decorated Christmas tree, advertising rates as low as 7.9% APR.

Niceville.com Community Partner

Categories
  • COMMUNITY NEWS
  • CRIME / PUBLIC SAFETY
  • FLORIDA NEWS
  • HEALTH & WELLNESS
  • HOME & GARDEN
  • IT'S GEEK TO ME
  • LARRY WILLIAMS
  • LOCAL NEWS & EVENTS
  • MARKETPLACE NEWS
  • MILITARY NEWS
  • NORTHWEST FLORIDA NEWS
  • OUTDOORS
  • ROADS / TRANSPORTATION
  • SCHOOL NEWS
  • THINGS TO DO
Advertisement
Eglin Federal Credit Union Mastercard promotional banner featuring a smiling couple in front of a decorated Christmas tree, advertising rates as low as 7.9% APR.

Niceville.com Community Partner

COMMUNITY PARTNERS
  • BODY DYNAMIC SOLUTIONS
  • EGLIN FEDERAL CREDIT UNION
  • MIDBAY VETERINARY HOSPITAL
  • NICEVILLE FARMERS MARKET
  • TRUCORDIA
  • RUCKEL PROPERTIES, INC.
  • THE WHARF 850
Advertisement
The Wharf 850 Niceville, Florida

Niceville.com Community Partner

Categories
  • COMMUNITY NEWS
  • CRIME / PUBLIC SAFETY
  • FLORIDA NEWS
  • HEALTH & WELLNESS
  • HOME & GARDEN
  • IT'S GEEK TO ME
  • LARRY WILLIAMS
  • LOCAL NEWS & EVENTS
  • MARKETPLACE NEWS
  • MILITARY NEWS
  • NORTHWEST FLORIDA NEWS
  • OUTDOORS
  • ROADS / TRANSPORTATION
  • SCHOOL NEWS
  • THINGS TO DO
Advertisement
Red Light Therapy at Body Dynamic Solutions in Niceville. Safe, non-invasive therapy with no drugs, no pain, and no known side effects. Call for a complimentary consultation and introductory session at (850) 339-4300. Located at 4566 E Highway 20, Suite 103, Niceville, Florida.

Niceville.com Community Partner

Advertisement
Deer Moss Creek® advertisement by Ruckel Properties, Inc. promoting available homes and lots.

Niceville.com Community Partner

ABOUT NICEVILLE.COM

PRIVACY POLICY

TERMS OF SERVICE

© 2026 Niceville.com. All Rights Reserved.

Type above and press Enter to search. Press Esc to cancel.